Emergency Preparedness and Response Plans
Observed: ● Halt activity out of the watercourse or evacuate by Flooding rivers/waterways, R6 Surface flooding starting
During a flooding emergency, staff are directed to evacuate participants via the R6 escape route, demonstrating an evacuation procedure.
During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas
The plan includes evacuation procedures (reroute to avoid flooding zones, halt activity and evacuate to higher ground) as part of the emergency response for flooding, demonstrating procedures for evacuation of people involved in the activity.
During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
Emergency plans include evacuation procedures for wildfire, directing evacuation via vehicle or to the closest safe zone.
During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)
Emergency plans include evacuation procedures directing staff to take participants to shelter when lightning is detected within 10 km during the activity.
During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
Emergency plans include evacuation procedures specifying routes (via vehicle or to closest safe zone) for wildfire emergencies.
During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
Wildfire emergency response includes specific evacuation routes (via vehicle or to nearest safe zone away from vegetation/near water bodies), addressing evacuation planning requirements.
Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
The emergency plan specifies evacuation routes and destinations (safe zone, away from vegetation, near water bodies) for wildfire emergencies.
During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
The emergency plan includes evacuation procedures directing people to a specific safe zone in the event of wildfire.
Emergency Assembly point/ Assembly location will be the main car park/ alternative ways in/out The main access road is the only way in/out of site.
The document specifies an emergency assembly point (main car park) and identifies access/evacuation routes, supporting evacuation procedures in emergency plans.
Emergency Assembly point/ Assembly location will be the main car park/ alternative ways in/out The main access road is the only way in/out of site.
The emergency plan specifies an assembly/evacuation point (main car park) and identifies the only access/egress route for evacuation purposes.
3.5 Halt activity The facilitators can halt an activity at any time if a hazard threatens the safety of any person associated with the activity. Contributing factors could be: ❖ New environmental hazard ❖ Other site users ❖ Weather ❖ Behaviour of the group ❖ Equipment failure
The SOP includes procedures for halting and thereby evacuating/removing people from the activity in response to identified hazards.
Emergency Assembly point/ The main access road is the only way in/out of site.
The emergency assembly point and evacuation route (the main access road) is documented in the location management plan.
Emergency Assembly point/ Assembly Point by Entry/Exit area on the grass alternative ways in/out
An emergency assembly point and alternative ways in/out are identified to facilitate evacuation of people involved in the activity.
During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas
Emergency procedures include evacuation routes (reroute to avoid flooding zones, evacuate to higher ground) for participants involved in the activity.
During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)
The emergency plan includes procedures for evacuation of participants to shelter in the event of lightning.
Emergency assembly point/ Assembly point in an emergency, any known emergency access information. alternative ways in/out
The plan includes alternative ways in/out to support evacuation of people involved in the activity.
Water Unusual sea ● Tsunami warning Move immediately to higher Civil Surge behaviour such as issued ground; avoid shoreline; resume Defence rapid water only when official all-clear given. Warning recession; rapid ● Swells exceeding unexplained water safe limit level change; feeling ● Rapid unexplained Tsunami a strong earthquake water level change Evacuation that makes it hard to zone stand or a long earthquake (>1 min).
The tsunami/water surge trigger response requires immediate movement to higher ground and references tsunami evacuation zones, demonstrating evacuation procedures for emergencies.
During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)
The LMP includes evacuation procedures specifying routes and safe zones for wildfire emergencies, satisfying the requirement for rescue or evacuation procedures.
Emergency assembly point/ Assembly point in an emergency, meet in the car park alternative ways in/out
The document identifies an assembly point and references alternative ways in/out, supporting evacuation procedures.
Yellow land threat zone: Covers the area that would need to be evacuated in the event of a dangerous tsunami. You should evacuate this area if requested, or if you feel or notice any natural warnings, until you are told it is safe to return.
The document includes evacuation procedures for tsunami events, contributing to emergency rescue/evacuation planning.
Emergency assembly point/ Assembly point in an emergency, any known emergency access information. alternative ways in/out
Recording alternative ways in/out supports evacuation and rescue procedures as part of emergency response planning.
Proof that the policy is being implemented — photos, completed forms, signed records, system screenshots. Paste a link to any file in Google Drive, Dropbox, SharePoint, or similar.
No implementation evidence added yet.