SMS Requirements
This includes occasions where transport is provided by AWL vehicles driven by staff; hire vehicles driven by staff or contractors; and private cars driven by staff, parents, or volunteers. Driving will generally be on public roads (both sealed and gravel) but may include access roads. Other off-road driving is out of scope
The SOP explicitly scopes the driving ancillary activity to cover staff, contractors, parents and volunteers, demonstrating the SMS covers ancillary services and associated persons.
1.1 Scope Camping activities can occur in a wide range of environments 1.1a Huts/cabins These areas often have an indoor sleeping area with beds/mattresses, indoor cooking, gear storage, toilets and potable water available. Usually power is not available. ❖ DOC huts ❖ Private establishments 1.1b Established campgrounds These areas often have an identified area to pitch tents, an identified cooking area/fire pit, toilets and potable water. Usually power is not available. ❖ DOC campgrounds ❖ Regional Council campgrounds ❖ Private establishments 1.1c Wilderness campgrounds These areas are often only needed in emergency situations or during off-track navigation programmes. These setups won't have any established camping, cooking, water collection or toilet areas
The SMS scope covers a wide range of camping environments including remote and wilderness settings, addressing safety of participants across all activity types.
1.1 Scope Swimming refers to an activity in which the sole purpose is to swim where the participant goes in a depth which is above their waist. Swimming can occur in a range of environments such as: ❖ Estuaries ❖ River deltas ❖ Streams ❖ Waterholes ❖ Beaches ❖ Lakes ❖ Coastal inlets ❖ Swimming pools
The SMS scope covers participants across a range of swimming environments, demonstrating inclusion of safety of participants in the SMS.
Getting onto the driveway from the main road. Fast cars Person/ are coming in the other Waitomo Oparure Equipment direction. High Being mindful of the speeds of other cars. Medium
The SMS scope includes ancillary/transport-related hazards (road access to the site), demonstrating that safety coverage extends beyond the core activity to ancillary activities.
Description Sleeping God Canyon is a steep, technical slot canyon in the Atuatumoe Stream, located in the Kauaeranga Valley near Thames, New Zealand. The canyon features a vertical descent of over 300 metres through a series of waterfalls, including multi- pitch abseils (rappels) up to ~80 m high, as well as numerous jumps and natural slides.
The Location Management Plan covers the full scope of the canyoning adventure activity including transport, approach, and in-canyon hazards, demonstrating that the SMS scope includes participants and associated activities.
High Ropes activities happen on established challenge courses throughout the north island that have an annual Association for Challenge Course Technology (ACCT) certificate.
The SMS scope covers the adventure activity (high ropes) and specifies site certification requirements, indicating coverage of participant and staff safety.
This Local Management Plan (LMP) has been developed as a practical tool to support the safe and effective delivery of programmes in public spaces where no adventurous activities are taking place. It outlines key parameters and identifies potential risks specific to operating in public environments—such as parks, reserves, and other shared community spaces. The LMP provides clear guidance on how to recognise, assess, and manage these risks to ensure that sessions run smoothly, participants remain safe, and the public environment is respected.
The LMP explicitly covers the safety of participants in ancillary/public-space activity areas, extending the SMS scope beyond pure adventure activities.
Rain Rain will make the rock slippery and hard to climb. There are not many covered areas/climbs. Abseil is still a possibility in light rain. Wind If a current wind weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered Lightning The 30-30 rule should be used. If it is less than 30 seconds between lightning and thunder then find cover and stop activity for 30 minutes Earthquake Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation
The plan addresses environmental hazards (rain, wind, lightning, earthquake) that could affect the safety of participants and staff during the activity, demonstrating SMS scope extends to environmental conditions.
Site Specific Hazards Describe what Controls to To What is the could cause the Uncontrolled minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating the harm or loss rating
The hazard table addresses risks to both persons and equipment across the activity site, indicating the SMS scope covers safety of staff, participants and others including ancillary site hazards.
Access Address/Directions Great Lakes Trail. from Kinloch - Kawakawa Bay (Walk/Bike) Parking At Kinloch, behind the fire station 2 Shelter no shelter along the trail Toilets No toilets on the trail Water No water along the trail Access type 9.2km Walking approx 3 hours. MTB grade 2/3. Easy, wide trail with a few good hills. Approx 45min.
The SMP covers ancillary access routes (walking and mountain biking to the activity site), indicating the scope of the SMS extends to ancillary activities that may pose health and safety risks.
Activity Date Created/Edited Editor (Name) Version Number MTB, Kayak, Tramp 10//2/25 Sam V.1
The SMS scope covers multiple adventure activities (MTB, Kayak, Tramp) at the site, indicating coverage of staff and participant safety across these activities.
Proof that the policy is being implemented — photos, completed forms, signed records, system screenshots. Paste a link to any file in Google Drive, Dropbox, SharePoint, or similar.
No implementation evidence added yet.