Staff have the authority to halt an activity if they identify increased risks (or combination of risks) that threaten the safety of any person associated with the activity.

Dynamic Management of Risk

Documentary evidence

32
  • 3.5 Halt activity The instructor can halt activity at any time if a hazard threatens the safety of any person associated with the activity Contributing factors could be: ❖ New environmental hazard ❖ Other site users ❖ Weather ❖ Behaviour of the group ❖ Equipment failure

    The SOP explicitly grants staff the authority to halt activity at any time if a hazard threatens the safety of any person associated with the activity.

  • 3.5 Halt activity The instructor can halt activity at any time if a hazard threatens the safety of any person associated with the activity Contributing factors could be: ❖ New environmental hazard ❖ Other site users ❖ Weather ❖ Behaviour of the group ❖ Equipment failure

    Staff are explicitly given authority to halt the activity at any time if a hazard threatens safety.

  • The instructor can halt an activity at any time if a hazard threatens the safety of any person associated with the activity Contributing factors could be: ❖ New environmental hazard ❖ Other site users ❖ Weather ❖ Behaviour of the group ❖ Equipment failure

    The SOP explicitly gives staff the authority to halt the activity at any time if a hazard threatens safety.

  • 3.5 Halt activity The facilitators can halt an activity at any time if a hazard threatens the safety of any person associated with the activity. Contributing factors could be: ❖ New environmental hazard ❖ Other site users ❖ Weather ❖ Behaviour of the group ❖ Equipment failure

    Staff are explicitly given authority to halt the activity at any time if a hazard threatens the safety of any person associated with the activity.

  • 3.5 Halt activity The instructor can halt activity at any time if a hazard threatens the safety of any person associated with the activity Contributing factors could be: ❖ New environmental hazard ❖ Weather ❖ Behaviour of the group ❖ Equipment failure

    The SOP explicitly grants instructors authority to halt the activity at any time if a hazard threatens safety.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    The SOP specifies 'Immediate halt of activity and evacuation to shelter' as a during-activity response to lightning, demonstrating staff authority to halt activities when safety is threatened.

  • During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)

    Staff are required to immediately halt the activity and evacuate in the event of wildfire, demonstrating authority to stop activity when safety is threatened.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are required to immediately halt the activity and evacuate to shelter when lightning flash-to-bang time is less than 30 seconds, demonstrating staff authority to halt activities when increased risks are identified.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are directed to immediately halt the activity and evacuate when lightning is observed within 10 km, demonstrating staff authority to stop an activity when risks increase.

  • During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)

    Staff are directed to immediately halt the activity and evacuate when wildfire is observed, demonstrating staff authority to stop an activity when risks increase.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are required to immediately halt the activity when lightning is observed within threshold distance, confirming their authority to stop activity for safety.

  • Observed: During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are required to immediately halt activity and evacuate when lightning is within 10 km, demonstrating clear authority to stop activities in response to increased risk.

  • During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)

    For wildfire, the SOP mandates immediate halt and evacuation during the activity, demonstrating staff authority to stop activity when increased risk is identified.

  • During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas

    Staff are directed to halt the activity and evacuate when flooding is observed during the activity, demonstrating staff authority to stop an activity when risks increase.

  • During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas

    The SOP explicitly includes 'Halt activity & evacuate' as a 'During Activity' trigger response, demonstrating staff authority to halt an activity when risk levels increase.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    The SOP explicitly directs an immediate halt of activity when lightning risk threshold is met, demonstrating staff authority to stop the activity.

  • Observed: ● Halt activity out of the watercourse or evacuate by Flooding rivers/waterways, R6 Surface flooding starting

    Staff are directed to halt the activity and evacuate when flooding is observed, demonstrating authority to stop an activity when increased risks are identified.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are required to immediately halt the activity and evacuate when a lightning threshold is met during the activity, satisfying the authority to halt requirement.

  • During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas

    The SOP explicitly authorises (and requires) staff to halt the activity and evacuate to higher ground when flooding is observed, demonstrating staff authority to stop the activity.

  • Swell Wave height Forecasted: Before Activity: Metservice building beyond forecast, rogue MetService Marine ● Discuss to postpone, cancel waves, change in Warning, significant wave or adjust activity from the colour or direction height ≥4m on exposed exposed swell areas of swell or wind. coast During Activity: Observed: ● Halt water activity & Rogue waves, breaking evacuate to land seas in sheltered zones

    Staff have authority to halt water activity and evacuate to land when observed swell conditions (rogue waves, breaking seas) exceed safe thresholds.

  • Observed: During Activity: *See warning signs ● Halt activity and provide shelter/warmth and adjust activity (time, intensity, route)

    Staff are directed to halt activity when cold exposure warning signs are observed, demonstrating authority and procedure to stop an activity when risks increase.

  • During Activity: Flash-to-bang <30 seconds (~10 km away) ● Immediate halt of activity and evacuation to shelter (avoid water, metal & high objects)

    Staff are given authority to immediately halt the activity and evacuate to shelter when lightning is within 10 km.

  • Observed: During Activity: *See warning signs ● Halt activity, remove the affected person from the heat, provide shade/water, and adjust activity (time, intensity, route)

    Staff are explicitly directed to halt activity when observed warning signs of heat exposure are present, evidencing staff authority to stop activities when risks are identified.

  • During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)

    Staff are empowered to immediately halt the activity and evacuate in the event of wildfire during the activity.

  • During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas

    Staff are given authority and clear instruction to halt the activity and evacuate to higher ground when flooding is observed during the activity.

  • During Activity: ● Immediate halt of activity and evacuation of the area via vehicle or to the closest safe zone (No vegetation area or close to large bodies of water)

    Staff are directed to immediately halt the activity and evacuate in the event of wildfire, demonstrating authority to stop activities when risk increases.

  • Earthquake Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation

    Staff are required to halt the activity immediately upon an earthquake, demonstrating authority to stop activities when safety is threatened.

  • Rai If a current rain weather warning is in place before the planned activity starts, the assessor will n contact the students and group contact. An alternative plan will be considered. Wind If a current wind weather warning is in place before the planned activity starts, the assessor will contact the students and group contact. An alternative plan will be considered.

    The assessor is given authority to consider alternative plans (including halting the activity) when adverse weather warnings are in place, demonstrating staff authority to halt the activity.

  • Wind If a current wind weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered

    Staff (programme manager/instructor) have authority to act on wind warnings and consider alternative plans, indicating authority to halt or modify activity based on identified risks.

  • Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation

    Staff are given authority and instruction to halt activity immediately upon an earthquake, consistent with the requirement for staff authority to stop activities when safety is threatened.

  • Wind If a current wind weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered

    The procedure allows for halting or modifying the activity when a wind weather warning is in place, indicating staff authority to stop or redirect activities based on identified risks.

  • Rain There is a high chance of snow during winter.If a current rain weather warning is in place before the planned activity starts, the assessor will contact the students and group contact. An alternative plan will be considered. Wind If a current wind weather warning is in place before the planned activity starts, the assessor will contact the students and group contact. An alternative plan will be considered.

    The assessor has authority to contact students and group contact and consider alternative plans when weather warnings are in place, indicating authority to halt or modify the activity.