Risk and Hazard Identification & Assessment
General Hazard & Risk Assessment This form outlines hazards, risks, assessment and controls for the named activity. Site specific hazards are identified in the site management plan Low Moderate High Extreme Harm/Loss Hazard Risk Rating? Controls Residual Risk What could go Why would this How serious? How can it be prevented? First try to eliminate, then minimise the risk Rating? wrong? happen? Who is responsible for implementing the control?
The operator has implemented a systematic process to identify hazards, assess their risk rating, and apply controls, with residual risk ratings recorded.
Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings).
The operator has systematically identified natural hazards, described the harm, assessed uncontrolled likelihood, and identified controls including elimination and minimisation measures.
Site Specific Hazards Activity Site Type of Describe Hazard Uncontroll Controls Residual Name Harm ed Risk Risk • Clean footwear at Casca Environme stations Tramping Kauri Dieback Medium Low des nt • Stay on formed tracks • Follow closure signage
The operator has systematically identified site-specific hazards (Kauri Dieback, fallen branches/trees) for tramping at the Cascades, assessed uncontrolled risk, and documented controls and residual risk.
Driving Risk Assessment This form outlines hazards, risks, assessment and controls for the named activity. Site specific hazards are identified in the site management plan Low Moderate High Extreme Harm Hazard Risk Rating? Controls How serious Residual What could go Why would this happen? is this? How can it be prevented? First try to e)liminate, then m)minimise the risk risk rating wrong? Serious Injury Death ● Instructor error Instructor to: - Vehicle Accident ● Collision with m) hold appropriate licence(s) another vehicle m) obey road rules and drive defensively at all times ● Slippery / change to m) be aware of changes in conditions and reduce speed accordingly road surface m) use headlights in poor visibility
A formal driving-specific hazard and risk assessment table identifies foreseeable hazards, assesses risk ratings, and specifies controls, satisfying the requirement for systematic risk identification and assessment.
Activity Hazard/Risk assessment RISK MATRIX. Likelihood of injury/harm Consequences of injury/harm Insignificant Moderate Major Catastrophic No / Minor injuries Medical treatment Extensive injuries Fatalities Very likely Medium High Extreme Extreme Likely Medium High High Extreme Unlikely Low Medium High Extreme Highly unlikely Low Low Medium High Extreme = Stop, look for alternative activity! High = Control to eliminate risk Medium = Control to minimise risk as far as reasonably practicable Low = Continue
The operator has a documented risk matrix for assessing the seriousness of identified hazards and determining the appropriate control response.
Overnight Camping Hazard & Risk Assessment This form outlines hazards, risks, assessment and controls for the named activity. Site specific hazards are identified in the site management plan
The operator has implemented a systematic overnight-specific hazard and risk assessment, identifying reasonably foreseeable hazards for overnight camping.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time. During Activity: Civil Observed: Defence ● Reroute to avoid flooding advice Flooding rivers/waterways, zones (waterways, low- Surface flooding starting lying areas) ● Halt activity & evacuate to higher ground areas
The document systematically identifies site-specific hazards (rain/flooding, wind/tree fall, heat, cold, storms/lightning, wildfire, volcano) with warning signs, triggers, and responses, demonstrating a systematic process for identifying foreseeable hazards and risks.
Site Specific Hazards Activity Site Type of Describe Hazard Uncontrolled Controls Residual Name Harm Risk Risk • Pre-ride briefing: educate riders about potential encounters with farm animals and Totar wildlife; remind them a Park to slow down, watch Moun Collision with the trail ahead, and be MTB Person Medium Low tain animals prepared to stop. Bike • Alert and yield: call Track out or use a bell when approaching animals; allow animals to move off the track; if necessary, dismount
The site-specific hazards table identifies activity-specific hazards (e.g. collision with animals, no water source, kicker jumps, wooden trail features, loose gravel) with uncontrolled risk ratings and controls, demonstrating systematic hazard identification and risk assessment.
Activity Hazard/Risk assessment RISK MATRIX. Likelihood of injury/harm Consequences of injury/harm Insignificant Moderate Major Catastrophic No / Minor injuries Medical treatment Extensive injuries Fatalities Very likely Medium High Extreme Extreme Likely Medium High High Extreme Unlikely Low Medium High Extreme Highly unlikely Low Low Medium High Extreme = Stop, look for alternative activity! High = Control to eliminate risk Medium = Control to minimise risk as far as reasonably practicable Low = Continue
The operator has implemented a systematic risk matrix for assessing the seriousness of each hazard and risk identified in their activities.
General Hazard & Risk Assessment This form outlines hazards, risks, assessment and controls for the named activity. Site specific hazards are identified in the site management plan
The operator has implemented a systematic general hazard and risk assessment process for the camping activity, identifying reasonably foreseeable hazards and risks.
Activity Hazard/Risk assessment RISK MATRIX. Likelihood of injury/harm Consequences of injury/harm Insignificant Moderate Major Catastrophic No / Minor injuries Medical treatment Extensive injuries Fatalities Very likely Medium High Extreme Extreme Likely Medium High High Extreme Unlikely Low Medium High Extreme Highly unlikely Low Low Medium High Extreme = Stop, look for alternative activity! High = Control to eliminate risk Medium = Control to minimise risk as far as reasonably practicable Low = Continue
The operator has implemented a systematic risk matrix process to identify and assess hazards and risks, including determining seriousness.
Site Specific Hazards Activit Site Type Describe Uncontr Control Resid y Nam of Hazard olled s ual e Harm Risk Risk
A dedicated site-specific hazards table records each hazard with type of harm, uncontrolled risk rating, controls and residual risk — demonstrating a systematic risk identification and assessment process.
Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings).
The operator has systematically identified natural hazards, described potential harm, assessed uncontrolled likelihood, and documented controls — demonstrating a systematic risk and hazard identification and assessment process.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings). Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The Natural Hazards section systematically identifies hazards, describes the harm, assesses uncontrolled likelihood, and lists elimination and minimisation controls, demonstrating a systematic risk and hazard identification and assessment process.
Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings).
The natural hazards table identifies specific hazards, describes potential harm, assesses uncontrolled likelihood, and lists controls — demonstrating systematic hazard identification and risk assessment.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings). Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The operator has documented a systematic natural hazard register describing harm, likelihood and controls, demonstrating risk identification and assessment.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The document demonstrates a systematic process for identifying foreseeable hazards (rain/flooding) including warning signs, forecast triggers, and observed triggers for kayaking/camping activities.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings).
The hazard register describes harm, assesses uncontrolled likelihood, and lists controls, demonstrating a systematic risk and hazard identification and assessment process.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings). Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The operator has systematically identified natural hazards (storms/lightning), described the harm, assessed likelihood, and documented controls, demonstrating a risk identification and assessment process.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The operator has implemented systematic processes to identify reasonably foreseeable hazards (e.g. rain/flooding) with warning signs, forecasted triggers, observed triggers, and trigger responses — demonstrating hazard identification and risk assessment.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The operator has implemented systematic processes to identify reasonably foreseeable hazards (e.g. rain/flooding) with warning signs, triggers and trigger responses documented in the Site Hazard Management table.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings). Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The operator has conducted systematic hazard identification and risk assessment for natural hazards including storms/lightning, with descriptions of harm, uncontrolled likelihood, and controls documented.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The operator has implemented a systematic process identifying site-specific hazards, warning signs, triggers and responses, demonstrating foreseeable hazard and risk identification and assessment.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The document implements a systematic process to identify foreseeable hazards (e.g. Rain/Flooding) with warning signs, forecasted and observed triggers, and trigger responses, demonstrating hazard identification and risk assessment.
Public have access to the top of the crag, there is a fence but is still possible for somebody to dislodge a rock from the top that could fall onto a group member. All students must wear helmets all the time while they Stonefields are participating in climbing. They need to be at least Outdoor Rockfall from the same height of the rock away from the rock before Stone fields Climbing Person above the Crag High they can remove their helmets. Approximately 10 m. Medium
Rockfall from above the crag is identified as a high uncontrolled risk with controls specified, demonstrating systematic hazard identification and risk assessment.
Activity Hazard/Risk assessment RISK MATRIX. Likelihood of injury/harm Consequences of injury/harm Insignificant Moderate Major Catastrophic No / Minor injuries Medical treatment Extensive injuries Fatalities Very likely Medium High Extreme Extreme Likely Medium High High Extreme Unlikely Low Medium High Extreme Highly unlikely Low Low Medium High Extreme = Stop, look for alternative activity! High = Control to eliminate risk Medium = Control to minimise risk as far as reasonably practicable Low = Continue
A systematic risk matrix is documented for assessing the likelihood and consequences of hazards, demonstrating a systematic process to identify and assess risks.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The operator has implemented a systematic process to identify foreseeable hazards (rain/flooding) with warning signs, triggers, and responses, demonstrating risk identification and assessment.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings).
The document provides a structured hazard register with description of harm, likelihood assessment, and controls for each hazard, demonstrating systematic identification and assessment of reasonably foreseeable risks.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The document implements a systematic site hazard management process with site-specific thresholds and triggers for identifying and assessing foreseeable hazards (e.g. rain/flooding), satisfying the requirement for systematic hazard identification and risk assessment.
Site Specific Hazards What is Describe what Uncontrolled Controls to To minimise or eliminate the harm or Residual Area Location the harm could cause the risk rating loss risk rating or loss harm or loss
The document implements a systematic hazard identification and risk assessment table with uncontrolled and residual risk ratings, demonstrating a process to identify and assess hazards and risks.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The operator has implemented a systematic site hazard management process identifying site-specific thresholds and triggers based on local hazards and technical adviser recommendations.
Hazar Description of harm Uncontrolled Controls d Likelihood Storms/ Lightning strike causing Unlikely (seasonal, Eliminate: Lightning fatality, burns, or severe but predictable via trauma; storm winds MetService ● Cancel, postpone or adjust activities if triggers leading to falling debris Thunderstorm are met. and equipment damage. Warnings). Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The operator has systematically identified hazards (storms/lightning), described potential harms, assessed uncontrolled likelihood, and documented elimination and minimisation controls.
Tree fall Crushing injuries, Likely in high wind Eliminate: fatalities, or entrapment conditions; from falling limbs/trees. otherwise Unlikely. ● Cancel, postpone or adjust activities if triggers are met. Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response Flooding Drowning, hypothermia, Likely (NZ rivers Eliminate: entrapment, loss of rise quickly under control in fast water. MetService heavy ● Cancel, postpone or adjust activities if triggers rain warnings). are met. Minimise: ● Identify Trigger points for natural hazards ● Monitor the Likelihood of natural hazards via monitor links. ● Avoid/minimise time in hazard zones ● Staff training on trigger response
The operator has systematically identified multiple natural hazards (tree fall, flooding) with descriptions of harm, likelihood assessments, and elimination/minimisation controls.
Site Specific Hazards Type Describe Uncontr Control Residual of Hazard olled s Risk Harm Risk Lake and Waterways • Clearly mark the lake and Deep water, waterways as "Out of steep/slippery banks, Bounds" on the Person High orienteering map. and potential toxic • Pre-event briefing emphasising Medium algae or waterborne that no student is to enter the bacteria. water.
The operator has systematically identified site-specific hazards (lake and waterways) with uncontrolled risk ratings and specific controls, demonstrating a systematic hazard identification and assessment process.
Site Specific Hazards Describe what Controls to To What is the could cause the Uncontrolled minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating the harm or loss rating Participants are to keep away from any machinery they might come across. Be aware of vehicle and tractor traffic on these roads. Roads are gravel so Whare Person/ Farm Related brief participants on papa Waipari Crag Equipment activities Medium riding or running. Low
A structured site-specific hazard table identifies hazards, their causes, uncontrolled risk ratings, and control measures, demonstrating a systematic process for identifying and assessing risks.
Site Specific Hazards Describe what Controls to To What is the could cause the Uncontrolled minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating the harm or loss rating
The document implements a systematic hazard identification and risk assessment table for the activity site, identifying hazards, uncontrolled risk ratings, controls, and residual risk.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor
The operator has implemented a systematic process to identify foreseeable hazards and risks at this location, including site-specific thresholds and triggers based on technical adviser recommendations.
Area Site harm or loss cause the harm or loss risk rating loss risk rating Participants are to keep away from any machinery they might come across. Be aware of vehicle and tractor traffic on these roads. Person/ Roads are gravel so brief participants on riding Pakheo Pakheo crag Equipment Farm Related activites Medium or running. Low
A site-specific hazard (farm-related activities including vehicle and tractor traffic) has been identified and assessed with an uncontrolled and residual risk rating.
Site Specific Hazards Describe what Controls to To What is the could cause the Uncontrolled minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating the harm or loss rating
The document implements a systematic hazard identification and risk assessment table for site-specific hazards, identifying harm, causes, uncontrolled risk ratings, controls, and residual risk ratings.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Residual What is the could cause the Uncontrolled or Controls to To minimise or eliminate the harm risk Area Location harm or loss harm or loss risk rating minimise or loss rating
The document implements a systematic hazard identification and risk assessment table that identifies hazards, causes of harm, uncontrolled risk ratings, controls, and residual risk ratings for each location.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain Rapid darkening of Forecasted: Before Activity: Metservice skies, increase in wind gusts, visible rain cells Observed: approaching, water pooling, rising river During Activity: levels.
The document implements a systematic hazard identification process with site-specific hazards, warning signs, triggers and trigger responses, demonstrating identification of reasonably foreseeable hazards and risks.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Date you Location Activity Type of Descrip Potential Management strategies identified of Hazard relevant hazard tion of severity the Hazard to? hazard 2025-02-03 Ngāruawāh MTB Man- Road 6 Stop group before the ia, New made Crossin driveway. Check the Zealand Hazard g at entrance is clear prior to quarry crossing. entranc e 2025-02-03 Ngāruawāh MTB Environm Grose 3 Havestudetns reduce ia, New ental Bush speed or walk through the Zealand Hazard and area with gorse/foliage on
The operator has implemented a systematic process to identify hazards by activity type, location, hazard type, description, and potential severity for each site.
Public Space – Risk Assessment General Hazards and Controls Public Presence ● Hazard: Disruption from members of the public. ● Risk Level: M ● Controls: Where possible, section off the activity area. Brief students about potential distractions. Instructors are to remain vigilant of the public entering the space.
The operator has systematically identified public-space hazards, assessed their risk level, and documented controls, demonstrating systematic risk identification and assessment.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations. Location Parameters Hazard Warning Signs Triggers Trigger Response Monitor Rain/ Rapid darkening of Forecasted: Before Activity: Metservice Flooding skies, water pooling, rising river levels, MetService Heavy Rain ● Discuss to postpone, cancel and discoloured Watch (50–70 mm in 12 or adjust activity away from hrs / 100 mm in 24 hrs) or flood zones (rivers, streams Area river water. Continuous gauges rainfall for an Severe Warning (≥70 mm and flooding areas) extended period of in 12 hrs) time.
The operator has implemented a systematic process identifying hazards (rain/flooding) with warning signs, triggers, and trigger responses, demonstrating hazard identification and risk assessment.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating Brief participants to be aware of spinning holds. It is not possible to tighten the holds so ensuring the participants are aware of the potential movement of holds and the risk this poses (very low) to Rock Motu ensure that they don't get too climbing 27/02/2024 Green Bay Moana Person Spinning Holds Medium spooked. Low
The operator has implemented a systematic hazard identification and risk assessment table for the rock climbing/abseil activity, identifying hazards, uncontrolled risk ratings, controls, and residual risk ratings.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating
The operator has implemented a systematic hazard identification and risk assessment table for the indoor rock climbing activity, identifying harm, causes, uncontrolled risk ratings and controls.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating
A systematic site-specific hazard identification and risk assessment table is implemented, identifying hazards, uncontrolled risk ratings, and controls for each risk.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating
The document includes a structured hazard identification and risk assessment table for the site, capturing harm/loss, causes, uncontrolled risk rating, and residual risk rating — demonstrating a systematic process to identify hazards and assess risks.
Volcani Mangakino Caldera is nearby, no threat to site c Earthquake Previous M5.1 in 1976, site is in the Waikato liquefaction Level 1 area.
Natural hazards (volcanic and earthquake risk) have been systematically identified and assessed for the specific site.
Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Volcani c Earthquake Auckland is slightly seismically active so earthquakes are possible but unlikely Tsunami Blockhouse Bay is near the coast, but it's located inside the Manukau Harbour, which reduces direct tsunami impact. Flooding Heavy rain can cause flash flooding, the area is grassy and may become saturated Landslide surround areas are low-land
The operator has systematically identified natural hazards (earthquake, tsunami, flooding, landslide, volcanic) that could give rise to risks during activities at the site.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating
The document includes a systematic site-specific hazard identification and risk assessment table, listing harm/loss, causes, uncontrolled risk ratings, controls, and residual risk ratings — demonstrating a process to identify foreseeable hazards and assess their seriousness.
Rain Do not operate in area in Metservice weather warning for rain. (May cause increased erosion and chance of falling objects) No major risk of flooding in caves as no streams or water sources are going into them. Wind Lightning Do not go into caves if lighting is forecasted. If lighting occurs udring a sessions return to carpark and seek shelter there.
The document systematically identifies foreseeable environmental hazards (rain, wind, lightning) and assesses associated risks for the caving activity.
This Local Management Plan (LMP) has been developed as a practical tool to support the safe and effective delivery of programmes in public spaces where no adventurous activities are taking place. It outlines key parameters and identifies potential risks specific to operating in public environments—such as parks, reserves, and other shared community spaces. The LMP provides clear guidance on how to recognise, assess, and manage these risks to ensure that sessions run smoothly, participants remain safe, and the public environment is respected.
The LMP describes a systematic process for identifying and managing risks specific to operating in public environments, satisfying the requirement for systematic hazard/risk identification and assessment.
Site Specific Hazards https://docs.google.com/spreadsheets/d/1oXZfpvv4rwzrFrW4a7jt3t7cFGkKw8J-1l4_qiVRg-A/edit?usp=sharing Describe what Eliminate Controls to To What is the could cause the Uncontrolled or minimise or eliminate Residual risk Area Location harm or loss harm or loss risk rating minimise the harm or loss rating
The document includes a site-specific hazard register with columns for hazard identification, risk rating, controls and residual risk, indicating a systematic process for identifying and assessing risks.
HAZARD: means an activity, arrangement, circumstance, event, occurrence, phenomenon, process, situation, or substance (whether arising or caused within or outside a place of work) that is an actual or potential cause or source of harm. HAZARD ASSESSMENT: is the overall process of determining whether a hazard is significant. HAZARD IDENTIFICATION: is the process of recognising that a hazard exists and defining its characteristics.
Defines hazard, hazard assessment and hazard identification, indicating the operator has formalised these concepts as part of their SMS framework.
ABL / Orienteering / Tramping 07/10/2024 Ed Hides V1
The document header on page 4 identifies this as a Location Management Plan for ABL/Orienteering/Tramping activities, dated 07/10/2024, indicating a systematic hazard and risk identification process has been conducted for these activities.