Internal Reviews of Adventure Activities
Programme modification/cancelation Programme manager contacts group contact or participants before a programme to adapt, postpone or cancel if: ➢ Weather forecast is going to cause unnecessary risk to participants. ➢ Any other site specific environmental parameters exceed the scope or have created substantial unnecessary risk ➢ Any other factors such as equipment or personnel have created unnecessary risk ➢ Known natural hazards have caused additional unnecessary risk
The operator has procedures for reviewing and adapting adventure activities when prompted by changes to environment, equipment, or personnel that may change hazards or risk levels.
1.2 Weather and Environmental Considerations Weather is monitored prior to the programme by the instructors and programme manager. At least 2 weather information sources should be looked at. These sources could include: Metservice, Metvuw, Windy, NIWA, Predict Wind. ❖ If a current weather warning is in place, the driver is to contact the program manager and discuss an alternative/adaptation to the programme because of driving conditions
The SOP includes procedures for reviewing and adapting the activity in response to changes in the environment (weather), demonstrating the activity is reviewed when prompted by environmental changes.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The plan notes it is based on local hazards and land manager/technical adviser recommendations, indicating the activity has been reviewed in response to site-specific conditions and adviser input.
Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The operator has reviewed adventure activities incorporating land manager advice and technical adviser recommendations, consistent with reviewing activities when prompted by environmental changes or new hazards.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The site hazard management section reflects review of the activity informed by land manager advice and technical adviser recommendations, evidencing review prompted by relevant triggers.
Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The activity review has been prompted by and incorporates land manager advice and technical adviser recommendations, reflecting review when prompted by changes in environment and identification of new hazards.
Weather and Environmental Parameters Rain If a current rain weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered. Wind If a current wind weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered.
The plan includes procedures for reviewing and adapting activity delivery in response to changes in the environment (weather warnings), consistent with reviewing activities prompted by environmental changes.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The site hazard management plan is reviewed and updated based on local hazard changes, land manager advice and technical adviser recommendations, indicating the operator reviews activities when prompted by changes to the environment or new hazards.
Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Earthquak No major earthquake history in area, possible liquefaction zone at the Hakarimata e Rail trail and entrance of the CYC Ngaruawahia camp Tsunami Flooding The Hakarimata Rail trail and entrance of the CYC Ngaruawahia camp has a regional scale flooding possibility. Karapiro Dam Break The entrance of the camp could be 1-2m underwater in the event of a Karapiro Dam break
The operator has reviewed the activity environment for natural hazards including earthquake, flooding and dam break scenarios, reflecting a review prompted by changes in or identification of environmental hazards.
Earthquake Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation
The procedure to halt activity after an earthquake and require external inspection before resumption demonstrates a review triggered by changes to the environment where activities are conducted.
Unstable rock Visual inspection on each visit, and beware after rain/ temperature changes rock may have changed.
The plan requires reassessment of rock stability after environmental changes (rain, temperature changes), reflecting a process for reviewing activities when environmental conditions change.
Weather and Environmental Parameters Rain Wind Lightning Swell Unstable rock Natural Hazards https://www.naturalhazardsportal.govt.nz/s/natural-hazard-risk/natural-hazards-in-your-area Volcani c Earthquake Tsunami Flooding Landslide Other
The plan captures weather/environmental parameters and natural hazards (including volcanic, earthquake, tsunami, flooding, landslide) to support review of activities when prompted by changes in environment or identification of new hazards.
Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The operator has reviewed and updated site-specific hazard parameters based on land manager advice and technical adviser recommendations, indicating review prompted by changes in environment or guidance.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The site hazard management section references technical adviser recommendations, indicating reviews are triggered by and incorporate expert and environmental change inputs.
Earthquake Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation
The plan addresses reviewing and responding to changes in the environment (post-earthquake) before resuming activities, consistent with reviewing activities when prompted by changes to the environment.
Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The operator has reviewed adventure activities incorporating land manager advice and technical adviser recommendations, consistent with reviewing activities when prompted by changes in environment or identification of new hazards.
The top abseil that comes down the rock wall is closed due to rust.
The operator has reviewed the adventure activity and identified a change in environment/equipment condition (rust on the top abseil anchor) and responded by closing that route.
Site Hazard Management Site-specific thresholds and triggers based on local hazards, land manager advice, or technical adviser recommendations.
The site hazard management is explicitly based on local hazards and updated through land manager and technical adviser input, supporting review of activities prompted by changes to hazards or the environment.
Location weather and environmental parameters Rain Rain will make the rock slippery and hard to climb. There are not many covered areas/climbs. Abseil is still a possibility in light rain. Wind If a current wind weather warning is in place, prior to the planned activity starting, the programme manager will contact the instructor and group contact. An alternative plan will be considered Lightning The 30-30 rule should be used. If it is less than 30 seconds between lightning and thunder then find cover and stop activity for 30 minutes Earthquake Earthquake: stop using the crag immediately and do not resume until the crag has been checked, inspected and verified safe from an external inspection from organisation
The document addresses changes to the environment (weather, seismic activity) where activities are conducted and specifies appropriate responses, consistent with reviewing activities when prompted by environmental changes.
Condition: Many of the anchors at the top are not user friendly. ie, 1 shackle that needs you to abseil rather than be lowered.
The SMP records a site-specific review finding about anchor conditions at Lower Bluff that identifies a hazard, indicating review of the activity site for changed conditions.
Volcanic Alert Level https://www.geonet.org.nz/volcano
The document references GeoNet for volcanic alert levels, indicating that changes to the environment (volcanic activity) are monitored and would prompt a review of the activity.
Proof that the policy is being implemented — photos, completed forms, signed records, system screenshots. Paste a link to any file in Google Drive, Dropbox, SharePoint, or similar.
No implementation evidence added yet.